皇冠体育寻求亚洲战略合作伙伴,皇冠代理招募中,皇冠平台开放会员注册、充值、提现、电脑版下载、APP下载。

首页体育正文

皇冠体育开户:Fukushima debris removal delayed by another year

admin2022-08-286

皇冠体育开户www.hg108.vip)是一个开放皇冠正网即时比分、皇冠体育开户的平台。皇冠体育开户平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP,提供皇冠正网代理开户、皇冠正网会员开户业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

ug环球官网www.ugbet.us)开放环球UG代理登录网址、会员登录网址、环球UG会员注册、环球UG代理开户申请、环球UG电脑客户端、环球UG手机版下载等业务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

网友评论